Showing posts with label experience. Show all posts
Showing posts with label experience. Show all posts

Tuesday, May 20, 2014

Modular Solutions for FAQ GSA questions

As a GSA contract holder for many years we have lots of questions GSA contracting officers have run by us. While we do not claim to be the experts on GSA contracting, we have learned and grown in experience with each new GSA contract award over the past 15 years. Some of the questions we have worked through:

1. Is Prevailing Wage Schedule Required? If the project is federally funded then prevailing wage is applicable on any site work.
2. Can My Modular Building Be Custom? Most GSA contracts are set up to be highly custom, our contract has available components to make each individual building as unique as required. Some contractors do no offer this flexibility and only offer models. You will need to evaluate the GSA contract vehicle with the vendor.
3. How Long Will It Take To Get A Custom Modular Building? Custom modular buildings are typically 90-120 days from approved plans. This can be expedited, depending on the use and difficulty of construction. Some "long-lead" items are highly specialized on federal projects, and require up to 12 weeks from date of order.
4. Will My New Modular Building Meet The Local Building Codes? As a rule, Modular Solutions, Ltd always complies with the local building codes and regulations. On a federal site, some vendors will only construct to the factory location building code. As a contracting officer you will want to ensure your RFP asks for local/state building code compliance. Build to the area, snow load, wind loads, energy code, and other applicable regional variables.
5. Can I Use An RFP For Procurement Instead Of A Bid? GSA allows you to use RFQ, RFP, Design-Build (SOQ), Sole Source, and other procurement methods in the best interest of the government. Which ever method makes the procurement process easier for your individual procurement needs.

These are just a few of the questions, stay tuned for more GSA tips, and GSA FAQ answers.

For More Information Contact Us At:

Modular Solutions, Ltd
Phone: 800-441-8577 x 1
email: information@mod-sol.com
website: www.modularsolutionsltd.com
facebook: www.facebook.com/modularsolutionsltd

all rights reserved, copyright, trademark ©

Monday, May 19, 2014

Modular Solutions For Project Management

We are frequently asked "why do I need a project manager or site superintendent for my modular building project"? While the modular building industry is built "off-site", it is identical to site construction. The goal is to accelerate the schedule and manage sub contractors on site to meet or beat a project schedule. Here are a few reasons why it is great to have a project manager and site superintendent on your modular building projects.
1. A safe site: Site managers watch for safety violations and make sure no accidental injuries or death happen on your project site.
2. Off-site quality control: Since you can not be at the factory every day, watching each phase of the modular building construction it is reassuring to know that you have a site manager and project manager that are watching the quality and code compliance of your modular building. Nothing is more disappointing than having to wait on-site while a modular building is being "fixed" to meet the specification and criteria you ordered. Also once everything is covered up, you don't know if the quality standards were met.
3. Coordination of schedule: Coordinating a modular building schedule is the same as site construction. There are many sub contractors, permits, inspections, etc to schedule and coordinate as a part of the modular building installation. It is reassuring to know that those details are handled by your site superintendent and project manager.
4. Budget Management: If a project manager is not on board, some sub contractors (perhaps low bid type), will try to keep the cost low in the beginning and then change order, or deliver a lower quality of workmanship than is acceptable in the industry. The ability to have a team that manages the sub contractors and hold them to the quality, and budget proposed on the project is peace of mind.
5. Experience: Site Managers, and Project managers are experienced in construction & modular solutions. By having an construction export on board watching your project from inception through warranty you know that the outcome will exceed your expectations.

For more information on building a better modular solution contact our team
Modular Solutions, Ltd
Phone: 800-441-8577 x 1
email: information@mod-sol.com
website: www.modularsolutionsltd.com
facebook:www.facebook.com/modularsolutionsltd