We have many clients that need the space, but just do not have the budget to build a brand new facility. Don't worry - we have a solution for that!
Read the attached case study for Creighton School District in Phoenix, Arizona which is only one of our many clients that have realized exceptional savings by looking at our used modular building inventory.
There are lots of reasons to consider used, when available:
* Used modular buildings are less expensive
* Used modular buildings are available quicker
* Used modular buildings can be utilized for disaster relief
* Used modular buildings are "green" and 100% recyclable
* Used modular buildings can be renovated or reconstructed so they are like new
* Used modular buildings allow you to see the building before, during, and after the purchase
* Used modular buildings can be leased or set up on a lease with option payment plan
For more information or to see our current inventory
Call: (800) 441-8577x 1
Email: information@mod-sol.com
Website: www.modularsolutionsltd.com
Monday, April 27, 2015
Thursday, April 23, 2015
Spring Is In The Air, Time For A Modular Building Check Up 5 Quick Tips
One great thing about spring is the opportunity to get outdoors and enjoy the season. We suggest you put your modular building on a spring cleaning calendar & include a few key items that will extend your building life cycle:
1. Clean out all the rain gutters, inspect for damages, or drainage issues. Bad gutters can cause rot in trims or the building foundation if the drainage is incorrect.
2. Inspect the roof to see if there were any winter storm damages. Sometimes an exposed shingle or or foam that was damaged by trees, or metal trim that is bent out of shape. Just because you purchased a 50 year roof, that does not mean nature will not impact that.
3. Cut back the landscape. One culprit of water damage or building damage is landscape too close to the modular building, watering patterns, etc. Make sure your building is not getting watered with the lawn.
4. Put on a new fresh coat of paint & caulk. Keeping your building spruced up makes it look better, but also keeps moisture out. Check the caulks and trims, for bowing, and missing caulk. Use an exterior rated product when replacing caulk.
5. Test your mechanical system. Clean out the filters, run the cycles, and just make sure the units are operating at their best capacity to save operating costs and extend your equipment life cycle.
If you would like some more great tips consult our service and maintenance team at Modular Solutions, Ltd
Phone: 800-441-8577 x 1 (Sales)
Email: Information@Mod-sol.com
website: www.modularsolutionsltd.com
all rights reserved copyright & trademark 2015 ©
1. Clean out all the rain gutters, inspect for damages, or drainage issues. Bad gutters can cause rot in trims or the building foundation if the drainage is incorrect.
2. Inspect the roof to see if there were any winter storm damages. Sometimes an exposed shingle or or foam that was damaged by trees, or metal trim that is bent out of shape. Just because you purchased a 50 year roof, that does not mean nature will not impact that.
3. Cut back the landscape. One culprit of water damage or building damage is landscape too close to the modular building, watering patterns, etc. Make sure your building is not getting watered with the lawn.
4. Put on a new fresh coat of paint & caulk. Keeping your building spruced up makes it look better, but also keeps moisture out. Check the caulks and trims, for bowing, and missing caulk. Use an exterior rated product when replacing caulk.
5. Test your mechanical system. Clean out the filters, run the cycles, and just make sure the units are operating at their best capacity to save operating costs and extend your equipment life cycle.
If you would like some more great tips consult our service and maintenance team at Modular Solutions, Ltd
Phone: 800-441-8577 x 1 (Sales)
Email: Information@Mod-sol.com
website: www.modularsolutionsltd.com
all rights reserved copyright & trademark 2015 ©
Monday, March 30, 2015
Permanent Alternative Construction-A Better Way To Build
When clients are looking at different methods of construction there are so many choices and each architect or consultant has their favorites for a variety of reasons. Today I wanted to share about Permanent Alternative Construction. When a client wants a building that is going to have an extended life cycle, and that is sustainable, and that reduces their carbon footprint, there are many choices. HOWEVER, when a client wants accomplish all of those things and wants to save months of construction overhead costs and be 100% recyclable- there is ONLY ONE method of construction and that is Permanent Alternative Construction (PAC)
Look at this recent case study of a project we provided for Lake Havasu City, Arizona. The transit department needed a building, had a set budget, and wanted the building to be energy efficient and sustainable.
Some great qualities that were designed into this design-build project:
* White reflective roof covering with extended life cycle
* Insulated stucco system, providing a more energy efficient R-Value, continuous building envelope
* Facings of the windows & doors on the site to take advantage of natural lighting
* Ergonomic interior design for flow and client seating and work stations
* Energy efficient mechanical systems that will save thousands in operational costs over the years
* Recycle content insulation and other components
* Low and NO VOC content components & product
* 100% Recycleable upon end of current user lifecycle
For more information on Permanent Alternative Construction (PAC), contact our team:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1 (Sales)
Email: information@mod-sol.com
website: www.modularsolutionsltd.com
Facebook: www.facebook.com/modularsolutionsltd
Look at this recent case study of a project we provided for Lake Havasu City, Arizona. The transit department needed a building, had a set budget, and wanted the building to be energy efficient and sustainable.
Some great qualities that were designed into this design-build project:
* White reflective roof covering with extended life cycle
* Insulated stucco system, providing a more energy efficient R-Value, continuous building envelope
* Facings of the windows & doors on the site to take advantage of natural lighting
* Ergonomic interior design for flow and client seating and work stations
* Energy efficient mechanical systems that will save thousands in operational costs over the years
* Recycle content insulation and other components
* Low and NO VOC content components & product
* 100% Recycleable upon end of current user lifecycle
For more information on Permanent Alternative Construction (PAC), contact our team:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1 (Sales)
Email: information@mod-sol.com
website: www.modularsolutionsltd.com
Facebook: www.facebook.com/modularsolutionsltd
Monday, March 23, 2015
Case Study, ADA Egress For CES Member
There are many locations throughout New Mexico that have ramps and stairs that were built from wood and the signs of aging are quite apparent. If a school district or non-profit organization has a building that does not meet current ADA requirements, or that has unsafe egress into a facility they face the challenge of losing funding or not qualifying for grants.
Modular Solutions, Ltd helped out a CES Member become compliant by providing new ADA ramps & decks.
With our in-house design team we were able to asses the requirements, and make sure the new egress for the facility was compliant.
There are many ways to design handicap access into a facility, but if your team does not design it properly it can be very expensive or it will fail inspection.
Call our team for a free inspection and proposal on getting compliant.
Phone: 800-441-8577 x 1
email: information@mod-sol.com
website: www.modularsolutionsltd.com
facebook: www.facebook.com/modularsolutionsltd
Modular Solutions, Ltd helped out a CES Member become compliant by providing new ADA ramps & decks.
With our in-house design team we were able to asses the requirements, and make sure the new egress for the facility was compliant.
There are many ways to design handicap access into a facility, but if your team does not design it properly it can be very expensive or it will fail inspection.
Call our team for a free inspection and proposal on getting compliant.
Phone: 800-441-8577 x 1
email: information@mod-sol.com
website: www.modularsolutionsltd.com
facebook: www.facebook.com/modularsolutionsltd
Monday, March 16, 2015
Behavioral Health Clinic Case Study
With a huge return of heroes and soldiers PTSD is on the rise both diagnosed, and undiagnosed. It is critical to have regional clinical facilities available for clients in distress. The extra time saved getting services, may save lives. Modular Solutions, Ltd was recently awarded a project in the Pueblo of Laguna for a state of the art behavioral heath care clinic.
Our team provided design-build construction services to offer a turnkey solution that was attractive, permanent, cost effective, and built by Modular Solutions, Ltd a Native American owned company.
Read a little more in the attached case study and see how we can help your community with creative behavioral health solutions.
For more information contact our team:
Phone: 800-441-8577 x 1 (sales)
Email: Information@mod-sol.com
Website: www.modularsolutionsltd.com
facebook: www.facebook.com/modularsolutionsltd
You Tube Channel: www.youtube.com/user/Modularsolutionsltd
Our team provided design-build construction services to offer a turnkey solution that was attractive, permanent, cost effective, and built by Modular Solutions, Ltd a Native American owned company.
Read a little more in the attached case study and see how we can help your community with creative behavioral health solutions.
For more information contact our team:
Phone: 800-441-8577 x 1 (sales)
Email: Information@mod-sol.com
Website: www.modularsolutionsltd.com
facebook: www.facebook.com/modularsolutionsltd
You Tube Channel: www.youtube.com/user/Modularsolutionsltd
Monday, March 2, 2015
Top 10 Tips On Inspecting Your Roof Before Spring
This year has been quite hard for roofing systems with the driving winds, rains, and snow storms the hit areas repeatedly. One critical item that needs to be done with your modular building will be to check the roof when the spring weather gets here. Winter storm debris, heavy snow loads, and excessive weather conditions can really cause havoc on a roof. The best thing to do is to get a professional up on the roof of your modular building and do a visual inspection. It is much better to go into spring rains knowing your roof needs repair and getting it fixed, than to respond to an emergency that happened, when all the roofing companies are swamped with business.
10 TIPS to help you inspect your roof
1. What type of roof do you have, every roofing system has special and unique things to look for that you can see on a visual inspection
(foam roofs change color, shingles blow off, metal roofs have connectors missing or seams are exposed, rubberized roofs have tears, torch down or cold applied roofs have bare spots exposed materials) by knowing what roof type you have you will know what to look for.
2. Call a professional: Most roofing companies will perform FREE inspections on roofs, hoping that if there is damage you will hire them to repair/replace. Make sure the roofing company is BBB rated and try to work with a local company.
3. If your roof is less than 10 years old and having damage, maybe consider a different type of roof covering if you are replacing it. There may be a better solution for your climate and weather conditions.
4. Look for debris trapped in corners, in gutters, under mechanical equipment. Debris can damage roofing material or hold water and never let the roofing material dry out.
5. Animals like woodpeckers and squirrels have hidden winter treasures in the valleys, and other ares of a roof -inspect for evidence of digging or tearing off sealant around roof caps etc.
6. Inspect the gutters and downspouts: Frequently those have been damaged or gaps during winter storms if not reattached properly water can rot wood or facia trims
7. Inspect all your roof penetrations: (ie mechanical drops, sky lights, vent stacks). Make sure they are properly caulked and sealed
8. Inspect trims and facia: Warped, or damaged facia can let water damage in causing irreparable damage to the sub roof structure.
9. Look for Warping: Sometimes this one is hard to see with the naked eye, but experts can help with looking for any warping of roofing materials and sub surfaces
10. Make sure you do this every spring: By keeping on top of maintenance you will ensure a longer life cycle for the roof of your modular structure, and you will ensure if there are any damages you catch them early enough to prevent further damage. Often times that can mean the difference between a roofing repair and an entire replacement.
For more information on what is the best roof type talk to our team:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1
Email: Information@mod-sol.com
website: www.modularsolutionsltd.com
You Tube: https://www.youtube.com/user/Modularsolutionsltd
All rights reserved, copyright, trademarked ©
10 TIPS to help you inspect your roof
1. What type of roof do you have, every roofing system has special and unique things to look for that you can see on a visual inspection
(foam roofs change color, shingles blow off, metal roofs have connectors missing or seams are exposed, rubberized roofs have tears, torch down or cold applied roofs have bare spots exposed materials) by knowing what roof type you have you will know what to look for.
2. Call a professional: Most roofing companies will perform FREE inspections on roofs, hoping that if there is damage you will hire them to repair/replace. Make sure the roofing company is BBB rated and try to work with a local company.
3. If your roof is less than 10 years old and having damage, maybe consider a different type of roof covering if you are replacing it. There may be a better solution for your climate and weather conditions.
4. Look for debris trapped in corners, in gutters, under mechanical equipment. Debris can damage roofing material or hold water and never let the roofing material dry out.
5. Animals like woodpeckers and squirrels have hidden winter treasures in the valleys, and other ares of a roof -inspect for evidence of digging or tearing off sealant around roof caps etc.
6. Inspect the gutters and downspouts: Frequently those have been damaged or gaps during winter storms if not reattached properly water can rot wood or facia trims
7. Inspect all your roof penetrations: (ie mechanical drops, sky lights, vent stacks). Make sure they are properly caulked and sealed
8. Inspect trims and facia: Warped, or damaged facia can let water damage in causing irreparable damage to the sub roof structure.
9. Look for Warping: Sometimes this one is hard to see with the naked eye, but experts can help with looking for any warping of roofing materials and sub surfaces
10. Make sure you do this every spring: By keeping on top of maintenance you will ensure a longer life cycle for the roof of your modular structure, and you will ensure if there are any damages you catch them early enough to prevent further damage. Often times that can mean the difference between a roofing repair and an entire replacement.
For more information on what is the best roof type talk to our team:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1
Email: Information@mod-sol.com
website: www.modularsolutionsltd.com
You Tube: https://www.youtube.com/user/Modularsolutionsltd
All rights reserved, copyright, trademarked ©
Tuesday, February 24, 2015
Permits For A Modular Building?
One question we are frequently asked is Do I really have to get a permit for my temporary modular building? In most cases the answer is YES.
Many states and local agencies across the USA have updated their code requirements and are even adding special clarifications when you choose to get a temporary modular building. The new laws suggest or require that the building must meet the current local building code. (IBC is the current building code, which year they have adopted and are using is the key). The great thing is that some jurisdictions have a special permit for temporary modular structures, but with that convenience comes a stipulation on how long you can keep it on the site. Below are a few key questions to consider before you place an order for your temporary modular building or before you buy one on line that you can not give back.
1. Who is the jurisdiction for approvals (local, state, or federal)
2. Is there a time restriction on how long this modular can stay on my site
3. How long will it take, and what documents will you require to get a permit
4. Are there any special code requirements for your area that we need to know about
5. Ask for a preconstruction meeting. They are usually free, and save lots of time during the learning curve is you are attempting to do it all on your own
Just a few tips to keep you out of trouble, and help you see the big picture on modular building installations.
For more information or to talk with a design consultant for free contact our team:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1 (sales)
email: Information@mod-sol.com
website: www.modularsolutionsltd.com
you tube video channel:www.youtube.com/user/Modularsolutionsltd
all rights reserved copyright & trademark 2015 ©
Many states and local agencies across the USA have updated their code requirements and are even adding special clarifications when you choose to get a temporary modular building. The new laws suggest or require that the building must meet the current local building code. (IBC is the current building code, which year they have adopted and are using is the key). The great thing is that some jurisdictions have a special permit for temporary modular structures, but with that convenience comes a stipulation on how long you can keep it on the site. Below are a few key questions to consider before you place an order for your temporary modular building or before you buy one on line that you can not give back.
1. Who is the jurisdiction for approvals (local, state, or federal)
2. Is there a time restriction on how long this modular can stay on my site
3. How long will it take, and what documents will you require to get a permit
4. Are there any special code requirements for your area that we need to know about
5. Ask for a preconstruction meeting. They are usually free, and save lots of time during the learning curve is you are attempting to do it all on your own
Just a few tips to keep you out of trouble, and help you see the big picture on modular building installations.
For more information or to talk with a design consultant for free contact our team:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1 (sales)
email: Information@mod-sol.com
website: www.modularsolutionsltd.com
you tube video channel:www.youtube.com/user/Modularsolutionsltd
all rights reserved copyright & trademark 2015 ©
Monday, February 23, 2015
A New Modular School Campus By Summer 2015
One of the largest reasons a school looks at prefabricated construction is a schedule that is impossible. The reason Modular Solutions, Ltd gets repeat and referral business of those clients is our dedication to customer service and exceeding customer expectations. It is still not too late to get into your new campus by Summer 2015.
How does it get done:
* Plans on file from previous schools that may work for your campus
* Experienced field team meets for free pre-construciton meetings, and helps determine a best value & best solution to meet space goals
* Purchasing Cooperative of America (PCA) vendor. Our contract is for design, construction, and site work for your new campus.
* Architectural team "in-house" that includes N.C.A.R.B. certificates to work in any location
* Factory production is direct from the factory, so we are able to identify critical path items and ensure they are completed on schedule
* Site work is performed by our licensed team. We do not have to depend on an outside 3rd party contractor to coordinate and complete the site work & infrastructure
Let us share some examples of projects completed in 120 days or less from inception - through occupancy
Call your design team member for details on how to get your modular campus in time for 2015/16 school year.
Modular Solutions, Ltd
Phone: 800-441-8577 x 1
email: information@mod-sol.com
website: www.modularsolutionsltd.com
facebook: www.facebook.com/modularsolutionsltd
all rights reserved copyright & trademark 2015 ©
How does it get done:
* Plans on file from previous schools that may work for your campus
* Experienced field team meets for free pre-construciton meetings, and helps determine a best value & best solution to meet space goals
* Purchasing Cooperative of America (PCA) vendor. Our contract is for design, construction, and site work for your new campus.
* Architectural team "in-house" that includes N.C.A.R.B. certificates to work in any location
* Factory production is direct from the factory, so we are able to identify critical path items and ensure they are completed on schedule
* Site work is performed by our licensed team. We do not have to depend on an outside 3rd party contractor to coordinate and complete the site work & infrastructure
Let us share some examples of projects completed in 120 days or less from inception - through occupancy
Call your design team member for details on how to get your modular campus in time for 2015/16 school year.
Modular Solutions, Ltd
Phone: 800-441-8577 x 1
email: information@mod-sol.com
website: www.modularsolutionsltd.com
facebook: www.facebook.com/modularsolutionsltd
all rights reserved copyright & trademark 2015 ©
Thursday, February 12, 2015
Renovation To The Rescue
Modular Buildings built in the 80's and 90's can have new life with renovation and retrofit. Sometimes a modular building was on a bad project site with water drain under the building, or the caulk was not trimmed out regularly, or the design may have been out of date. Some clients would call the landfill & say take it away, but other clients want to try and renovate their modular building into a new creation.
There are benefits and disadvantages with choosing to renovate an older modular building. Lets look at both a little bit.
Benefits:
1. Keeping up to 20,000 lbs of waste out of a landfill
2. Not having to go through the permit process again and maybe change your entire site
3. Not having to reconnect utilities again
4. Getting a fresh new look for your organization, creating an inviting atmosphere
5. Cost-effective way to update your image
6. No need to relocate or close down during change over
7. Much quicker than building a new modular structure
8. Design to save energy, and be more efficient
Disadvantages:
1. Business has to work around the renovation and noise of construction
2. Some of your wish list might not be able to be done, due to structural or other restrictions
3. Sometimes you find hidden damage or unknowns that can cost additional fees
4. May require all new fixtures and mechanical options
5. Will not be as energy efficient as a new modular building
6. Work conditions may require some weekend or overtime work
Which ever you decide the experts at Modular Solutions, Ltd can help you make the right decision for your structure.
Contact us at:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1
email: information@mod-sol.com
website: www.modularsolutionsltd.com
facebook: www.facebook.com/modularsolutionsltd
all rights reserved copyright & trademark 2015 ©
There are benefits and disadvantages with choosing to renovate an older modular building. Lets look at both a little bit.
Benefits:
1. Keeping up to 20,000 lbs of waste out of a landfill
2. Not having to go through the permit process again and maybe change your entire site
3. Not having to reconnect utilities again
4. Getting a fresh new look for your organization, creating an inviting atmosphere
5. Cost-effective way to update your image
6. No need to relocate or close down during change over
7. Much quicker than building a new modular structure
8. Design to save energy, and be more efficient
Disadvantages:
1. Business has to work around the renovation and noise of construction
2. Some of your wish list might not be able to be done, due to structural or other restrictions
3. Sometimes you find hidden damage or unknowns that can cost additional fees
4. May require all new fixtures and mechanical options
5. Will not be as energy efficient as a new modular building
6. Work conditions may require some weekend or overtime work
Which ever you decide the experts at Modular Solutions, Ltd can help you make the right decision for your structure.
Contact us at:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1
email: information@mod-sol.com
website: www.modularsolutionsltd.com
facebook: www.facebook.com/modularsolutionsltd
all rights reserved copyright & trademark 2015 ©
Tuesday, February 3, 2015
Superbowl Commercial
If we had $4.5 Million for a 30 Second Commercial during the superbowl, we would have loved to share the message of "A better way to build"
We did make a little commercial for facebook that is fun to watch, of if you put a building "anywhere" in Arizona where would it go?
SUPER BOWL COMMERCIAL FACEBOOK LINK
The pictures are very obviously renderings, but it lets your imagination start to open up and get creative.
If you would like more information on modular construction and why it is a better way to build, contact our team:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1
Email: information@mod-sol.com
Website: www.modularsolutionsltd.com
Facebook: www.facebook.com/modularsolutionsltd
all rights reserved copyright & trademark 2015 ©
We did make a little commercial for facebook that is fun to watch, of if you put a building "anywhere" in Arizona where would it go?
SUPER BOWL COMMERCIAL FACEBOOK LINK
The pictures are very obviously renderings, but it lets your imagination start to open up and get creative.
If you would like more information on modular construction and why it is a better way to build, contact our team:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1
Email: information@mod-sol.com
Website: www.modularsolutionsltd.com
Facebook: www.facebook.com/modularsolutionsltd
all rights reserved copyright & trademark 2015 ©
Tuesday, January 20, 2015
Tips To Control The Thermostat Wars In A Modular Building-Five Great Tips
Modular buildings have great solutions for avoiding thermostat wars!
At Modular Solutions, Ltd we offer ideas in the preconstruction phase, so that if you are considering a modular structure you can make an educated choice. These tips will extend the life cycle of your HVAC equipment and will help with thermostat wars.
What does industry standard mean?
In most cases, if your specification sheet says industry standard or does not specify you will get wall mounted mechanical units, (some companies do not even provide return air duct), and you get one duct run per each modular section, with one thermostat per modular section. While this is a quick way to build in the factory this is not really an efficient design for a mixed used facility.
Tip 1: ZONES
You can still get the affordable wall mounted mechanical units (suggest you ask for fully ducted supply & return air ducts), but ask for "zones". Zones help the air flow to areas that are related, and keep a common area with its' own supply. For example a run of offices may have their own thermostat, while an open training room that spans several modular sections may have its' own zone.
Tip 2: TYPE OF UNITS
For a few dollars more you can look at getting a split system or package units that go on the roof or ground that have high Seasonal Energy Efficiency Rating (SEER) ratings. The SEER rating system was adopted for residential construction, but has translated into commercial construction since it is so highly recognized. By choosing a more efficient brand and type of HVAC system your design is now customized to meet your space planning goals and will cost less to operate. Who wouldn't' want a lower monthly utility bill?
Tip 3: LIFE CYCLE OF UNITS
Mechanical units reach a point where they cost more to operate than just giving in and exchanging for new units. This is called life cycle. If your mechanical units are having maintenance costs and service calls regularly, it may be time to consider replacing them with new units. While this can be an expensive capital outlay, you will see dramatic energy cost savings.
Tip 4: LOCK BOXES
Sometimes no matter how well your team has designed the HVAC system, some people are just hot or cold. If you have a lockbox on the thermostat equipment only specified staff will be able to make adjustments if required.
Tip 5: PROGRAMMABLE THERMOSTATS
Thermostats are just a measuring device, and just cycle on or off based on what they measure the temperature at. Part of having an efficient design is to use programmable thermostats. You can do great pre-planning by starting the heat or cool cycle a little early. When employees start arriving they walk into a climate controlled environment. Don't be afraid to use the manual override. If you see there is a storm coming and let the building warm over night and keep a steady heat. Using your thermostats wisely extends the life cycle of your HVAC equipment.
For more information on how to get the perfect design-build modular building contact our team:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1
Email: Information@mod-sol.com
website: www.modularsolutionsltd.com
all rights reserved copyright & trademark 2015 ©
At Modular Solutions, Ltd we offer ideas in the preconstruction phase, so that if you are considering a modular structure you can make an educated choice. These tips will extend the life cycle of your HVAC equipment and will help with thermostat wars.
What does industry standard mean?
In most cases, if your specification sheet says industry standard or does not specify you will get wall mounted mechanical units, (some companies do not even provide return air duct), and you get one duct run per each modular section, with one thermostat per modular section. While this is a quick way to build in the factory this is not really an efficient design for a mixed used facility.
Tip 1: ZONES
You can still get the affordable wall mounted mechanical units (suggest you ask for fully ducted supply & return air ducts), but ask for "zones". Zones help the air flow to areas that are related, and keep a common area with its' own supply. For example a run of offices may have their own thermostat, while an open training room that spans several modular sections may have its' own zone.
Tip 2: TYPE OF UNITS
For a few dollars more you can look at getting a split system or package units that go on the roof or ground that have high Seasonal Energy Efficiency Rating (SEER) ratings. The SEER rating system was adopted for residential construction, but has translated into commercial construction since it is so highly recognized. By choosing a more efficient brand and type of HVAC system your design is now customized to meet your space planning goals and will cost less to operate. Who wouldn't' want a lower monthly utility bill?
Tip 3: LIFE CYCLE OF UNITS
Mechanical units reach a point where they cost more to operate than just giving in and exchanging for new units. This is called life cycle. If your mechanical units are having maintenance costs and service calls regularly, it may be time to consider replacing them with new units. While this can be an expensive capital outlay, you will see dramatic energy cost savings.
Tip 4: LOCK BOXES
Sometimes no matter how well your team has designed the HVAC system, some people are just hot or cold. If you have a lockbox on the thermostat equipment only specified staff will be able to make adjustments if required.
Tip 5: PROGRAMMABLE THERMOSTATS
Thermostats are just a measuring device, and just cycle on or off based on what they measure the temperature at. Part of having an efficient design is to use programmable thermostats. You can do great pre-planning by starting the heat or cool cycle a little early. When employees start arriving they walk into a climate controlled environment. Don't be afraid to use the manual override. If you see there is a storm coming and let the building warm over night and keep a steady heat. Using your thermostats wisely extends the life cycle of your HVAC equipment.
For more information on how to get the perfect design-build modular building contact our team:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1
Email: Information@mod-sol.com
website: www.modularsolutionsltd.com
all rights reserved copyright & trademark 2015 ©
Wednesday, January 14, 2015
Net Zero Building, How Do We Get There?
Net zero is a fairly new term in the construction industry that simply means when designing and constructing a building you incorporate specifications and components that will generate more energy than it uses. Sound impossible? Not at all. By incorporating new generation solar/wind/geothermal and other technologies, it is very possible to construct your new building and have it generate more power than it consumes.
Net Zero was first introduced in the housing and residential modular industry as a way for home owners to get "off-the-grid" or to spend less each month on their energy bills. That technology created an interest in the concept, but was on the fringe and really was not affordable in the mainstream construction industry. As a result of advances in construction technologies, renewable energy systems, and academic research, creating Net Zero Energy buildings is becoming more and more feasible. for a full read on what Department of Energy (DOE) and National Renewable Energy Laboratory (NREL) CLICK here. The new modern approach has actually been renamed Zero Energy Buildings (ZEB's) by DOE.
1. Design Smart: Incorporate the latest technology, and use energy star and energy efficient components and products
2. Investigate: Visit with local building officials and see what other local construction projects did to make their building a ZEB, and what did not work
3. Use renewable energy sources available within the building’s footprint: PV, solar hot water, and wind located on the building
4. Develop an urgency: If your project has community support you may find allies in the most unlikely places. Let the community know you are designing a ZEB and see what resources become available
For more information contact our design-build team at:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1 (sales)
Email: information@Mod-sol.com
website: www.modularsolutionsltd.com
all rights reserved copyright & trademark 2015 ©
Net Zero was first introduced in the housing and residential modular industry as a way for home owners to get "off-the-grid" or to spend less each month on their energy bills. That technology created an interest in the concept, but was on the fringe and really was not affordable in the mainstream construction industry. As a result of advances in construction technologies, renewable energy systems, and academic research, creating Net Zero Energy buildings is becoming more and more feasible. for a full read on what Department of Energy (DOE) and National Renewable Energy Laboratory (NREL) CLICK here. The new modern approach has actually been renamed Zero Energy Buildings (ZEB's) by DOE.
1. Design Smart: Incorporate the latest technology, and use energy star and energy efficient components and products
2. Investigate: Visit with local building officials and see what other local construction projects did to make their building a ZEB, and what did not work
3. Use renewable energy sources available within the building’s footprint: PV, solar hot water, and wind located on the building
4. Develop an urgency: If your project has community support you may find allies in the most unlikely places. Let the community know you are designing a ZEB and see what resources become available
For more information contact our design-build team at:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1 (sales)
Email: information@Mod-sol.com
website: www.modularsolutionsltd.com
all rights reserved copyright & trademark 2015 ©
Monday, January 5, 2015
New Year, New Opportunities
It is always great to start the new year off and look at all the possible opportunities. Within your industry, I am sure you face some challenges that you are trying to sort out & get a creative and innovative solution to.
In the modular industry, we see some trends in 2015 to which we are looking ahead, and offering innovative solutions!
EDWOSB: Many agencies did not meet their hiring goals for this group. OUR SOLUTION: OnSite Construction Management (a modular solutions dealership) Woman owned, $10M bonding & GSA contract holder.
School Funding: With a deficit in state budgets, schools are awaiting funds. This puts projects behind schedule or needing a "one-stop-shop" solution. OUR SOLUTION: Cooperative contracts will be the budget and schedule solution. Cooperative organizations offer superior services through strategic vendor partnerships. Modular Solutions, Ltd holds a national contract award with Purchasing Cooperative of America (PCA) and in New Mexico, Cooperative Educational Services (CES). For educational spending we are able to offer the entire design-build solution for your agency.
Veteran Affairs Medical Facilities: While the funding has increased some, there are still very tight restrictions on spending for new facilities or improvements. OUR SOLUTION: Modular Solutions, Ltd has been providing high quality medical facilities for federal agencies since we were awarded our GSA contract in 2000. We have provided free standing medical clinics, dental clinics, renovation of facilities, addition to existing facilities, and turnkey design-build projects.
Permanent Accelerated Construction: Many clients are already behind schedule without having a design or team in place, because they went with traditional construction methods design/ bid/ re-bid/ over budget. Being faced with cancel the project or return funds to the federal government, we have a better solution! OUR SOLUTION: Permanent Accelerated Construction (PAC). PAC is an alternative to traditional site built construction. Our clients are able to get concrete floors, multi-story construction, creative architectural embellishments, and 50+ year life cycle. PAC construction can pick up the slack in the schedule and make up precious months lost while trying to get a traditional site built structure in place.
For more information on any of our topics contact our team:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1
email: information@mod-sol.com
website: www.modularsolutionsltd.com
all rights reserved copyright & trademark 2015 ©
In the modular industry, we see some trends in 2015 to which we are looking ahead, and offering innovative solutions!
EDWOSB: Many agencies did not meet their hiring goals for this group. OUR SOLUTION: OnSite Construction Management (a modular solutions dealership) Woman owned, $10M bonding & GSA contract holder.
School Funding: With a deficit in state budgets, schools are awaiting funds. This puts projects behind schedule or needing a "one-stop-shop" solution. OUR SOLUTION: Cooperative contracts will be the budget and schedule solution. Cooperative organizations offer superior services through strategic vendor partnerships. Modular Solutions, Ltd holds a national contract award with Purchasing Cooperative of America (PCA) and in New Mexico, Cooperative Educational Services (CES). For educational spending we are able to offer the entire design-build solution for your agency.
Veteran Affairs Medical Facilities: While the funding has increased some, there are still very tight restrictions on spending for new facilities or improvements. OUR SOLUTION: Modular Solutions, Ltd has been providing high quality medical facilities for federal agencies since we were awarded our GSA contract in 2000. We have provided free standing medical clinics, dental clinics, renovation of facilities, addition to existing facilities, and turnkey design-build projects.
Permanent Accelerated Construction: Many clients are already behind schedule without having a design or team in place, because they went with traditional construction methods design/ bid/ re-bid/ over budget. Being faced with cancel the project or return funds to the federal government, we have a better solution! OUR SOLUTION: Permanent Accelerated Construction (PAC). PAC is an alternative to traditional site built construction. Our clients are able to get concrete floors, multi-story construction, creative architectural embellishments, and 50+ year life cycle. PAC construction can pick up the slack in the schedule and make up precious months lost while trying to get a traditional site built structure in place.
For more information on any of our topics contact our team:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1
email: information@mod-sol.com
website: www.modularsolutionsltd.com
all rights reserved copyright & trademark 2015 ©
Tuesday, December 30, 2014
Looking Forward To 2015
Our goal in 2015 will be to build solutions for space challenges! Our team has already had some great schedule and technical challenges put before us for 2015! If you think you have a project that seems impossible, we are here to help develop a solution! No location, or schedule, or design will be too crazy for our team to meet & help get it done!
For more information on Modular Solutions, Ltd contact our team:
email: information@mod-sol.com
website: www.modularsolutionsltd.com
Phone: 800-441-8577 x 1 (Sales)
all rights reserved copyright, trademark ©
For more information on Modular Solutions, Ltd contact our team:
email: information@mod-sol.com
website: www.modularsolutionsltd.com
Phone: 800-441-8577 x 1 (Sales)
all rights reserved copyright, trademark ©
Tuesday, December 16, 2014
Light Up Your Commercial Modular Building
This time of year there are fun places to go & look at lights, and commercial buildings are no exception
A few of my favorites are in today's blog.
So if you are thinking about how to make your commercial modular building a little brighter this season, just get the glitter & the lights out & get creative!
For more information contact our team at:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1
email: information@mod-sol.com
website: www.modularsolutionsltd.com
all rights reserved, copyright trademark 2014©
A few of my favorites are in today's blog.
So if you are thinking about how to make your commercial modular building a little brighter this season, just get the glitter & the lights out & get creative!
For more information contact our team at:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1
email: information@mod-sol.com
website: www.modularsolutionsltd.com
all rights reserved, copyright trademark 2014©
Monday, December 8, 2014
Purchasing Cooperative of America Awards Five Year Contract To Modular Solutions, Ltd
What is Cooperative Purchasing?
Cooperative purchasing is a way for small and remote (school districts, non-profits, local, county, state municipalities) to buy products and or services from a vendor that is prequalified, and that will offer the best value.
Purchasing Cooperative Of America (PCA) is a purchasing cooperative with contracts available for Public, Private and Charter Schools, Municipalities, States, Federal and Other Government Agencies, State and Private Colleges and Universities, and Non-Profit, Religious and Charitable Organizations . PCA members in all 50 States and the U.S. territories.
PCA is administered by Region III Education Service Center in Victoria, Texas, a Texas state agency. The State Agency connection is vitally important when members are spending federal funds. Where federal dollars are spent or commingled, the purchasing cooperative used must be administered by a State agency with the [cooperative] contracts awarded and held by that agency. Region III ESC awards and holds PCA contracts and administers the PCA cooperative purchasing program. Members benefit because PCA understands the needs of small as well as large public purchasing departments and their limits on time, personnel and expertise. The PCA cooperative program combines the benefits of specialty, local, and regional co-ops into a national program appealing to national companies with the value of industry best practice.
Modular Solutions, Ltd was awarded the PCA contract for best value, prior experience, flexible design, and superior qualifications.
For more information on cooperative purchasing or Modular Solutions, Ltd contract contact your representative:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1
email: information@mod-sol.com
website: www.modularsolutionsltd.com
Cooperative purchasing is a way for small and remote (school districts, non-profits, local, county, state municipalities) to buy products and or services from a vendor that is prequalified, and that will offer the best value.
Purchasing Cooperative Of America (PCA) is a purchasing cooperative with contracts available for Public, Private and Charter Schools, Municipalities, States, Federal and Other Government Agencies, State and Private Colleges and Universities, and Non-Profit, Religious and Charitable Organizations . PCA members in all 50 States and the U.S. territories.
PCA is administered by Region III Education Service Center in Victoria, Texas, a Texas state agency. The State Agency connection is vitally important when members are spending federal funds. Where federal dollars are spent or commingled, the purchasing cooperative used must be administered by a State agency with the [cooperative] contracts awarded and held by that agency. Region III ESC awards and holds PCA contracts and administers the PCA cooperative purchasing program. Members benefit because PCA understands the needs of small as well as large public purchasing departments and their limits on time, personnel and expertise. The PCA cooperative program combines the benefits of specialty, local, and regional co-ops into a national program appealing to national companies with the value of industry best practice.
Modular Solutions, Ltd was awarded the PCA contract for best value, prior experience, flexible design, and superior qualifications.
For more information on cooperative purchasing or Modular Solutions, Ltd contract contact your representative:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1
email: information@mod-sol.com
website: www.modularsolutionsltd.com
Tuesday, November 25, 2014
Happy Thanksgiving From Modular Solutions, Ltd
Thank you to everyone that has supported Modular Solutions, Ltd this year. We are looking into the new year with a healthy backlog of production orders, and some really fun projects.
We are grateful that our family at Modular Solutions, Ltd has grown, and that we have built a great team!
Contact us:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1
email: information@mod-sol.com
website: www.modularsolutionsltd.com
We are grateful that our family at Modular Solutions, Ltd has grown, and that we have built a great team!
Contact us:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1
email: information@mod-sol.com
website: www.modularsolutionsltd.com
Wednesday, November 19, 2014
Prefabricated Prison Solutions
There is a growing population in the USA that is almost impossible to keep up with, and that is prison inmates. With a tough economy, and rampant substance abuse small and petty crimes are overloading the prison system. Overcrowding is a huge problem that leads to additional challenges within the prison system. It takes on average over 24 months to design a prison addition and deal with the complexities of an addition or a new facility. Most states have adopted prefabricated prison methods. This is accomplished in many different ways.
* Concrete Cells
* Steel Cells
* Modular Construction All Steel
The fabrication time for modular prison units has had prison facilities across the USA ready to occupy in months instead of years. There are many additional design features are incorporated into a prison or jail facility, depending on the security level.
If you are facing tough overcrowding prison challenges, then contact our team of experts for a design-build solution. We will take you walk you through commissioning, and design phase through full warranty. No project is to remote or too challenging.
Contact our team:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1
Email: information@Mod-sol.com
website: www.modularsolutionsltd.com
all rights reserved, copyright, trademark ©
* Concrete Cells
* Steel Cells
* Modular Construction All Steel
The fabrication time for modular prison units has had prison facilities across the USA ready to occupy in months instead of years. There are many additional design features are incorporated into a prison or jail facility, depending on the security level.
If you are facing tough overcrowding prison challenges, then contact our team of experts for a design-build solution. We will take you walk you through commissioning, and design phase through full warranty. No project is to remote or too challenging.
Contact our team:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1
Email: information@Mod-sol.com
website: www.modularsolutionsltd.com
all rights reserved, copyright, trademark ©
Friday, November 14, 2014
Cabinets-Cabinets, What Type Should I Put In My Modular Building?
At Modular Solutions,Ltd we are frequently involved in the early planning stages of an addition with our clients. One question we hear frequently is what type of cabinet should we put in our facility. The answer to that is driven by budget, functionality, use, personal taste, and schedule.
When we work with our clients during the commissioning or preconstruction phase we talk through a variety of questions to help them decide what is the best fit for their long and short term goals, and what is the best solution to meet cabinet and storage needs.
(5) Most Common Cabinet Types:
1. PREFABRICATED: This term is commonly used when there is a thin paper veneer over a compressed wood product and this is the face of your cabinets. For a really tight budget, very compressed schedule, or a low use area this type of cabinet will fit the use.
2. ALL WOOD FACED DOORS: This type of cabinet is attractive, and durable great for offices or standard daily use. They can be found "in-stock" or can be custom order depending on selection. The pricing is moderate but overall a good investment.
3. LAMINATE CABINETS: Laminate cabinets are commonly found in medical labs or doctors offices. They are washable and non-porous so they make a great "clean" option to store medical supplies. The cost is on the higher end, but when purchased from a quality manufacturer they will endure. They are usually custom order so allow a little more time in the schedule for this type of cabinet.
4. GARAGE STORAGE CABINETS: Large "BOX" stores carry these type of storage cabinets. They are surprisingly durable, and very low cost. They are not recommended for office use or high impact kitchen use, but you will see them in projects installed by owners because of the attractive cost factor and the quick delivery method.
5. KITCHEN ON STEROIDS: Everyone has walked into the box stores and seen the elaborate designs available for a beautiful kitchen area. Many of our church clients will upgrade to a more decorative cabinet system to make the kitchen feel like a home or residence. Some of our business offices will also make their breakroom kitchen areas a place worthy of a break.
Other things that are design considerations would be knobs, hardware, glazing, storage needs, plumbing, ventilation, etc. Working with our design experts we help you make an educated design choice for the best value on your project.
For more information contact our team at:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1
Email: information@mod-sol.com
website: www.modularsolutionsltd.com
all rights reserved, copyright, trademark ©
When we work with our clients during the commissioning or preconstruction phase we talk through a variety of questions to help them decide what is the best fit for their long and short term goals, and what is the best solution to meet cabinet and storage needs.
(5) Most Common Cabinet Types:
1. PREFABRICATED: This term is commonly used when there is a thin paper veneer over a compressed wood product and this is the face of your cabinets. For a really tight budget, very compressed schedule, or a low use area this type of cabinet will fit the use.
2. ALL WOOD FACED DOORS: This type of cabinet is attractive, and durable great for offices or standard daily use. They can be found "in-stock" or can be custom order depending on selection. The pricing is moderate but overall a good investment.
3. LAMINATE CABINETS: Laminate cabinets are commonly found in medical labs or doctors offices. They are washable and non-porous so they make a great "clean" option to store medical supplies. The cost is on the higher end, but when purchased from a quality manufacturer they will endure. They are usually custom order so allow a little more time in the schedule for this type of cabinet.
4. GARAGE STORAGE CABINETS: Large "BOX" stores carry these type of storage cabinets. They are surprisingly durable, and very low cost. They are not recommended for office use or high impact kitchen use, but you will see them in projects installed by owners because of the attractive cost factor and the quick delivery method.
5. KITCHEN ON STEROIDS: Everyone has walked into the box stores and seen the elaborate designs available for a beautiful kitchen area. Many of our church clients will upgrade to a more decorative cabinet system to make the kitchen feel like a home or residence. Some of our business offices will also make their breakroom kitchen areas a place worthy of a break.
Other things that are design considerations would be knobs, hardware, glazing, storage needs, plumbing, ventilation, etc. Working with our design experts we help you make an educated design choice for the best value on your project.
For more information contact our team at:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1
Email: information@mod-sol.com
website: www.modularsolutionsltd.com
all rights reserved, copyright, trademark ©
Tuesday, November 11, 2014
Equipment Lease, Section 179 Tax Benefits-Before Year End!
It is getting time for businesses that run on a calendar fiscal year to consider equipment needs, and space planning for next year. There is a little known tax incentive Section 179 that allows greater tax benefits to small and midsize companies looking to expand.
There are strategic advantages to leasing a new our used modular building versus purchasing one.
The US government has put a program together, Section 179, specifically for small to mid-sized business owners allowing them to expense or deduct their full equipment purchases from the same year tax return or “gross income”. Modular Solutions, Ltd has great partners that can help structure a tailored finance agreement which will allow you to expense the full amount, 100% of the equipment on this year’s current tax documents and you have the flexibility to pay off the remaining equipment amount either quickly, in as little as 2 years or as long as 8 years!
Enhanced Expense Limits, Section 179, 2014
This year’s deduction limit, as of January has taken a dramatic drop. The maximum equipment cost that may be written off is $25,000. The maximum amount that your business can spend to qualify is $200,000 total on equipment. For brand new equipment only, the bonus depreciation rate is 50%. However we are remaining optimistic that legistaltion may increase limits before year end.
Section 179 Background
Section 179 was originally referred to as the “SUV/Hummer deduction.” It was used to offset the cost of an SUV or business vehicle costs, which was included in the “Stimulus Act.” The Stimulus Act was created to improve the economy and although it continues to change, it is the most beneficial tax benefit for small businesses in particular.
Qualifying Property
The property must be Tangible Personal Property, and must be used for the business at a rate greater than 50%. New or used equipment is accepted. It is probable that businesses purchase Tangible Personal Property consistently: Equipment (machines, etc.), modular buildings, manufacturing tools, vehicles, software, and furniture.
Section 179 Tax Deduction is filed under IRS form 4562.Don’t forget to keep complete records of; lease agreement, purchasing details, acquired & delivery details of your business equipment!
*Tax information provided above is intended for educational purposes only. Please consult tax attorney for expert advice.* Leasing information courtesy of ILS one of our great leasing partners.
For more information contact our team:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1
email: information@mod-sol.com
website: www.modularsolutionsltd.com
There are strategic advantages to leasing a new our used modular building versus purchasing one.
The US government has put a program together, Section 179, specifically for small to mid-sized business owners allowing them to expense or deduct their full equipment purchases from the same year tax return or “gross income”. Modular Solutions, Ltd has great partners that can help structure a tailored finance agreement which will allow you to expense the full amount, 100% of the equipment on this year’s current tax documents and you have the flexibility to pay off the remaining equipment amount either quickly, in as little as 2 years or as long as 8 years!
Enhanced Expense Limits, Section 179, 2014
This year’s deduction limit, as of January has taken a dramatic drop. The maximum equipment cost that may be written off is $25,000. The maximum amount that your business can spend to qualify is $200,000 total on equipment. For brand new equipment only, the bonus depreciation rate is 50%. However we are remaining optimistic that legistaltion may increase limits before year end.
Section 179 Background
Section 179 was originally referred to as the “SUV/Hummer deduction.” It was used to offset the cost of an SUV or business vehicle costs, which was included in the “Stimulus Act.” The Stimulus Act was created to improve the economy and although it continues to change, it is the most beneficial tax benefit for small businesses in particular.
Qualifying Property
The property must be Tangible Personal Property, and must be used for the business at a rate greater than 50%. New or used equipment is accepted. It is probable that businesses purchase Tangible Personal Property consistently: Equipment (machines, etc.), modular buildings, manufacturing tools, vehicles, software, and furniture.
Section 179 Tax Deduction is filed under IRS form 4562.Don’t forget to keep complete records of; lease agreement, purchasing details, acquired & delivery details of your business equipment!
*Tax information provided above is intended for educational purposes only. Please consult tax attorney for expert advice.* Leasing information courtesy of ILS one of our great leasing partners.
For more information contact our team:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1
email: information@mod-sol.com
website: www.modularsolutionsltd.com
Monday, November 3, 2014
What Is A Purchasing Cooperative?
According to widipedia, A purchasing cooperative is a type of cooperative arrangement, to combine buying power to get lower prices from selected suppliers. Purchasing Cooperatives are used most frequently by governmental entities, since they are required to follow laws requiring competitive bidding above certain thresholds. Counties, municipalities, schools, colleges and universities in the majority of states can sign an interlocal agreement or contract that allows them to legally use a contract that was procured by another governmental entity.
What types of commodity are there? There are various types of commodities. Purchasing rules vary from state to state so many purchasing commodities choose to make a Statewide offering. For example CES of NEW MEXICO offers suppliers and services to local or state agencies who wants to be a free member of the commodity and take advantage of the time and financial savings realized throughout the state of New Mexico. The goal of CES is to provide superior services through strategic partners.
Other commodities make offerings to federal agencies. For example GSA is a national commodity, that any federal agency can purchase goods or services. Some state and local agencies recognize GSA, and others do not. The state procurement regulations dictate availability of this on a local/state basis.
Modular Solutions, Ltd is a procurement partner on the CES and GSA Schedule.
For more information on purchasing modular buildings through a commodity contract visit our team for a FREE consultation!
Modular Solutions, Ltd
Phone: 800-441-8577 x 1
Email: information@mod-sol.com
website: www.modularsolutionsltd.com
all rights reserved, copyright, trademark ©
What types of commodity are there? There are various types of commodities. Purchasing rules vary from state to state so many purchasing commodities choose to make a Statewide offering. For example CES of NEW MEXICO offers suppliers and services to local or state agencies who wants to be a free member of the commodity and take advantage of the time and financial savings realized throughout the state of New Mexico. The goal of CES is to provide superior services through strategic partners.
Other commodities make offerings to federal agencies. For example GSA is a national commodity, that any federal agency can purchase goods or services. Some state and local agencies recognize GSA, and others do not. The state procurement regulations dictate availability of this on a local/state basis.
Modular Solutions, Ltd is a procurement partner on the CES and GSA Schedule.
For more information on purchasing modular buildings through a commodity contract visit our team for a FREE consultation!
Modular Solutions, Ltd
Phone: 800-441-8577 x 1
Email: information@mod-sol.com
website: www.modularsolutionsltd.com
all rights reserved, copyright, trademark ©
Wednesday, October 29, 2014
Cost Effective Designs To Get A Higher Ceiling
One question we frequently hear is how do I get a higher ceiling in my modular building? Some uses like worship facilities, or multipurpose rooms, or physical activity spaces need a higher ceiling to effectively service the space goals.
The Challenge:
When a modular building gets over 15' or 16' high in most states, the transport gets extremely cost prohibitive. This reduces the cost savings that are realized by choosing modular construction. Our clients have come to us with this challenge and Modular Solutions, Ltd has come up with some cost-effective design solutions that help keep the transport fees affordable, and help keep the overall budget of the project in line with original cost projections.
1. Telescoping Roof: A telescoping roof system is one that is raised when it arrives on site allowing the building sections to transport down the road for the lower delivery costs, and still gain the additional ceiling height once the building is installed on site.
2. Hinged Roof: A hinged roof system is similar to a telescoping roof. This is common for smaller structures that are only two or three sections to obtain a nice high pitch in snow country.
3. Site Installed Stacks: Installing sections on top of each other with proper foundation and crane rigging on site saves time and money by allowing high roof sections to be set on each other with proper design & engineering details.
4. Clearspan Beams: Open up the ceiling and use a decorative steel duct system so it can be exposed allowing the roof beams and duct work to be open, like in a warehouse or restaurant setting. This picks up 1-2 additional feet in the ceiling height.
These are just a few of the creative and innovative solutions Modular Solutions, Ltd has developed for clients that have the need for additional ceiling height in a modular building structure.
For more information regarding how to design innovative space solutions contact our team:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1 (sales)
Email: Information@mod-sol.com
Website: www.modularsolutionsltd.com
all rights reserved copyright, trademark
The Challenge:
When a modular building gets over 15' or 16' high in most states, the transport gets extremely cost prohibitive. This reduces the cost savings that are realized by choosing modular construction. Our clients have come to us with this challenge and Modular Solutions, Ltd has come up with some cost-effective design solutions that help keep the transport fees affordable, and help keep the overall budget of the project in line with original cost projections.
1. Telescoping Roof: A telescoping roof system is one that is raised when it arrives on site allowing the building sections to transport down the road for the lower delivery costs, and still gain the additional ceiling height once the building is installed on site.
2. Hinged Roof: A hinged roof system is similar to a telescoping roof. This is common for smaller structures that are only two or three sections to obtain a nice high pitch in snow country.
3. Site Installed Stacks: Installing sections on top of each other with proper foundation and crane rigging on site saves time and money by allowing high roof sections to be set on each other with proper design & engineering details.
4. Clearspan Beams: Open up the ceiling and use a decorative steel duct system so it can be exposed allowing the roof beams and duct work to be open, like in a warehouse or restaurant setting. This picks up 1-2 additional feet in the ceiling height.
These are just a few of the creative and innovative solutions Modular Solutions, Ltd has developed for clients that have the need for additional ceiling height in a modular building structure.
For more information regarding how to design innovative space solutions contact our team:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1 (sales)
Email: Information@mod-sol.com
Website: www.modularsolutionsltd.com
all rights reserved copyright, trademark
Thursday, October 23, 2014
Fire Safety, What is NFPA 285?
Modular Buildings and Site Built Structures, should be built in accordance with safety in mind!
Understanding What is NFPA 285
In 1998, the National Fire Protection Association (NFPA) established the NFPA 285 “Standard Fire Test Method for Evaluation of Fire Propagation Characteristics of Exterior Non-Load-Bearing Wall Assemblies Containing Combustible Components.” NFPA 285 provides a determination of vertical fire performance for exterior wall assemblies, which is verified by actual testing. It is intended to help builders reduce the potential for upward spread of fire through wall.
The requirement for a weather-resistive barrier is as follows:
WRB (Weather-Resistive Barrier) Code Requirement: 1403.5 Vertical and Lateral Flame Propagation – Exterior walls on buildings of Type I, II, III, or IV construction that are greater than 40 feet (12.192m) in height above grade plane, and contain a combustible water-resistive barrier, shall be tested in accordance with, and comply with the acceptance criteria of NFPA 285.
For this reason, Modular Solutions, Ltd partners with companies such as DuPont™ Tyvek® air and water barriers designed for commercial construction because they have been tested and shown to meet NFPA 285, the National Fire Protection Association fire performance standard for vertical wall assemblies.
For more information on fire safety in multistory modular construction consult our team:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1 (sales)
Email: information@mod-sol.com
website: www.modularsolutionsltd.com
facebook: www.facebook.com/modularsolutionsltd
all rights reserved, copyright trademark ©
Understanding What is NFPA 285
In 1998, the National Fire Protection Association (NFPA) established the NFPA 285 “Standard Fire Test Method for Evaluation of Fire Propagation Characteristics of Exterior Non-Load-Bearing Wall Assemblies Containing Combustible Components.” NFPA 285 provides a determination of vertical fire performance for exterior wall assemblies, which is verified by actual testing. It is intended to help builders reduce the potential for upward spread of fire through wall.
The requirement for a weather-resistive barrier is as follows:
WRB (Weather-Resistive Barrier) Code Requirement: 1403.5 Vertical and Lateral Flame Propagation – Exterior walls on buildings of Type I, II, III, or IV construction that are greater than 40 feet (12.192m) in height above grade plane, and contain a combustible water-resistive barrier, shall be tested in accordance with, and comply with the acceptance criteria of NFPA 285.
For this reason, Modular Solutions, Ltd partners with companies such as DuPont™ Tyvek® air and water barriers designed for commercial construction because they have been tested and shown to meet NFPA 285, the National Fire Protection Association fire performance standard for vertical wall assemblies.
For more information on fire safety in multistory modular construction consult our team:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1 (sales)
Email: information@mod-sol.com
website: www.modularsolutionsltd.com
facebook: www.facebook.com/modularsolutionsltd
all rights reserved, copyright trademark ©
Friday, October 17, 2014
What Will Your Modular Building Be For Halloween?
Sometimes it is fun to forget the formalities and just have fun with your decorating. Modular buildings can easily transform into seasonal decorations with a few quick easy tricks (or treats)
TIPS FOR DECORATING YOUR MODULAR BUILDING:
1) A little goes a long way, if you are a business you don't want to scare the neighbors and children too badly
2) Use materials that can be easily removed. Traces of spider webs and hay bails are reminders of Halloween past
3) Pick a theme and keep it simple (pumpkins or ghosts or candy corns) using items you don't remind replacing if someone likes your decorating idea too much
4) Lighting can create an ambiance. There are a variety of rope lights and solar lights available to help create a fun atmosphere
5) Keep it SAFE. Halloween is meant to be fun and an accident or mishap can hurt your image and pocketbook.
Have a safe & great Halloween from Modular Solutions, Ltd
all rights reserved copyright, trademark 2014 ©
TIPS FOR DECORATING YOUR MODULAR BUILDING:
1) A little goes a long way, if you are a business you don't want to scare the neighbors and children too badly
2) Use materials that can be easily removed. Traces of spider webs and hay bails are reminders of Halloween past
3) Pick a theme and keep it simple (pumpkins or ghosts or candy corns) using items you don't remind replacing if someone likes your decorating idea too much
4) Lighting can create an ambiance. There are a variety of rope lights and solar lights available to help create a fun atmosphere
5) Keep it SAFE. Halloween is meant to be fun and an accident or mishap can hurt your image and pocketbook.
Have a safe & great Halloween from Modular Solutions, Ltd
all rights reserved copyright, trademark 2014 ©
Tuesday, October 14, 2014
What Services Can A Modular Company Provide?
Modular companies show lots of great looking finished modular building projects on their websites with pretty landscape, and extravagant porches, and mixed traditional and modular construction. One great question we hear is "how much of that project did you complete"? Here is a summary of the different types of companies in the modular industry. Of course all of this information is "TYPICAL" however it is good resource for anyone interested in purchasing a modular building, and will help you do your homework & see how the seller is licensed and what services they can legally provide.
Another great reason to get a physical copy of a license is to research the license history and validity.
* DEALER: A dealer buys and sells modular buildings from other people. Mostly "stock" units with industry standard finishes, some are licensed to install the buildings many only can sell modular buildings. Dealers are generally not licensed to do any site work.
* GENERAL CONTRACTOR: A general contractor hires a modular building company to build or fabricate the modular building and then provides the site work & finishes to complete the building. A general contractor does not usually do any design work or fabricate modular buildings. A general contractor does not usually have architectural services.
* CONSTRUCTION MANAGER: A construction manager is a logistics partner. They usually have some background in management of projects but are not usually licensed to handle any of the specific construction work. They typically get a percentage of the contract amount to oversee a general contractor, manufacturer, architect and dealer offering management advise along the way.
*ARCHITECT: An architect has to be licensed in the state they are drawing for. An architect can design the modular building, but sometimes is they are not aware of the special criteria it takes to design a modular building in sections and how to keep it affordable.
*MANUFACTURER: A modular building manufacturer usually sells to a dealer, or a general contractor. The manufacturers' responsibility stops at the factory door, and within the confines of the box. Sometimes when a wholesale manufacturer sells a building to a dealer there are gray areas that get overlooked or missed.
DESIGN-BUILD FACTORY DIRECT ARCHITECTURAL/GENERAL CONTRACTOR/MANUFACTURER: Modular Solutions, Ltd is a design-build general contractor that specializes in modular buildings. By working with clients from inception we are able to provide architectural design, site work and general contracting responsibilities, and control the entire process in our manufacturing facility. When you work with Modular Solutions, Ltd you are getting the experts in every field under one roof.
The best way to determine if a modular building company can provide you with everything you need to get a temporary or permanent modular building installed is to ask for their licenses. See how far they can legally take your project and how much will they complete for you.
For more information on modular building construction contact our team:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1 (Sales)
Email: information@mod-sol.com
Website: www.modularsolutionsltd.com
all rights reserved, copyright, trademark 2014 ©
Another great reason to get a physical copy of a license is to research the license history and validity.
* DEALER: A dealer buys and sells modular buildings from other people. Mostly "stock" units with industry standard finishes, some are licensed to install the buildings many only can sell modular buildings. Dealers are generally not licensed to do any site work.
* GENERAL CONTRACTOR: A general contractor hires a modular building company to build or fabricate the modular building and then provides the site work & finishes to complete the building. A general contractor does not usually do any design work or fabricate modular buildings. A general contractor does not usually have architectural services.
* CONSTRUCTION MANAGER: A construction manager is a logistics partner. They usually have some background in management of projects but are not usually licensed to handle any of the specific construction work. They typically get a percentage of the contract amount to oversee a general contractor, manufacturer, architect and dealer offering management advise along the way.
*ARCHITECT: An architect has to be licensed in the state they are drawing for. An architect can design the modular building, but sometimes is they are not aware of the special criteria it takes to design a modular building in sections and how to keep it affordable.
*MANUFACTURER: A modular building manufacturer usually sells to a dealer, or a general contractor. The manufacturers' responsibility stops at the factory door, and within the confines of the box. Sometimes when a wholesale manufacturer sells a building to a dealer there are gray areas that get overlooked or missed.
DESIGN-BUILD FACTORY DIRECT ARCHITECTURAL/GENERAL CONTRACTOR/MANUFACTURER: Modular Solutions, Ltd is a design-build general contractor that specializes in modular buildings. By working with clients from inception we are able to provide architectural design, site work and general contracting responsibilities, and control the entire process in our manufacturing facility. When you work with Modular Solutions, Ltd you are getting the experts in every field under one roof.
The best way to determine if a modular building company can provide you with everything you need to get a temporary or permanent modular building installed is to ask for their licenses. See how far they can legally take your project and how much will they complete for you.
For more information on modular building construction contact our team:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1 (Sales)
Email: information@mod-sol.com
Website: www.modularsolutionsltd.com
all rights reserved, copyright, trademark 2014 ©
Friday, October 3, 2014
Employee Housing, How To Keep It Affordable Five Easy Tips
You have a school district or clinic 50 miles from the next closest town, and all the surrounding land is federal or tribal so the question arises- Where will our employees live?
How can we keep our employees local and give them good living facilities - the answer is easy!
Build modular housing.
The oil and gas & railroad industries have been building remote housing and recreational facilities for their employees for years. The difference between those industries and education or medical housing is that a large majority of educational and medical staff are married with children. The old "bunkhouse" mentality does not work for this type of employee housing. A general study has proven that absenteeism and job hopping has been lowered by having affordable and attractive housing available on site for the employees.
FIVE EASY TIPS:
1. Keep the housing near the clinic or school. By using existing infrastructure you can keep the costs lower and employees will be minutes from work.
2. Design multiple plans. By accommodating 1,2,&3 br footprints you are able to save space when a smaller family is hired and have ample room for larger families. Some of our clients even choose single family homes so if a really large family moves in they can have sufficient space.
3. Don't be afraid to "GO-UP". Multistory facilities can save land use if you are in an area where available space is tight.
4. Keep it simple. When you choose prefabricated, try to find "existing" plans to work with. Sometimes creating custom or special order plans are fun, but can cost more money than choosing designs that have worked for other employee housing locations.
5. Build housing that is sustainable, green and that has extended life cycle. An employee looks at the total cost to stay, and high utility bills are a contributing factor. By designing smart and helping the environment you will build a community that will last and be attractive for many generations to come.
For more information on employee housing contact our team:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1
email: information@mod-sol.com
website: www.modularsolutionsltd.com
Facebook: www.facebook.com/modularsolutionsltd
all rights reserved copyright, trademark ©
How can we keep our employees local and give them good living facilities - the answer is easy!
Build modular housing.
The oil and gas & railroad industries have been building remote housing and recreational facilities for their employees for years. The difference between those industries and education or medical housing is that a large majority of educational and medical staff are married with children. The old "bunkhouse" mentality does not work for this type of employee housing. A general study has proven that absenteeism and job hopping has been lowered by having affordable and attractive housing available on site for the employees.
FIVE EASY TIPS:
1. Keep the housing near the clinic or school. By using existing infrastructure you can keep the costs lower and employees will be minutes from work.
2. Design multiple plans. By accommodating 1,2,&3 br footprints you are able to save space when a smaller family is hired and have ample room for larger families. Some of our clients even choose single family homes so if a really large family moves in they can have sufficient space.
3. Don't be afraid to "GO-UP". Multistory facilities can save land use if you are in an area where available space is tight.
4. Keep it simple. When you choose prefabricated, try to find "existing" plans to work with. Sometimes creating custom or special order plans are fun, but can cost more money than choosing designs that have worked for other employee housing locations.
5. Build housing that is sustainable, green and that has extended life cycle. An employee looks at the total cost to stay, and high utility bills are a contributing factor. By designing smart and helping the environment you will build a community that will last and be attractive for many generations to come.
For more information on employee housing contact our team:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1
email: information@mod-sol.com
website: www.modularsolutionsltd.com
Facebook: www.facebook.com/modularsolutionsltd
all rights reserved copyright, trademark ©
Tuesday, September 30, 2014
Box On Wheels, Isn't That What A Modular Building Is?
One comment that the modular industry hears frequently is "I don't want a trailer, it is just a box on wheels". Our goal is help you understand that while some companies in the modular industry still design and sell a "box-on-wheels" there is so much more available. Companies like Modular Solutions, LTD take pride in having an architectural staff, and building permanent structures that have 50+ year life cycles, and are sustainable and good for the environment.
I have been in the modular industry since the 80's and it has been great to see the pioneers in the industry that have built hotels, hospitals, military dormitories, and all types of permanent structures with great structural and aesthetic upgrades. Modular Solutions, Ltd has been a member of the modular building institute that showcases projects in our industry that push the envelope of creativity, and really take modular projects to a new level. There is no reason to settle, when you can have the very best.
For more information on permanent modular construction contact our team:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1
email: information@mod-sol.com
facebook: www.facebook.com/modularsolutionsltd
website: www.modularsolutionsltd.com
all rights reserved copyright, trademark 2014
I have been in the modular industry since the 80's and it has been great to see the pioneers in the industry that have built hotels, hospitals, military dormitories, and all types of permanent structures with great structural and aesthetic upgrades. Modular Solutions, Ltd has been a member of the modular building institute that showcases projects in our industry that push the envelope of creativity, and really take modular projects to a new level. There is no reason to settle, when you can have the very best.
For more information on permanent modular construction contact our team:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1
email: information@mod-sol.com
facebook: www.facebook.com/modularsolutionsltd
website: www.modularsolutionsltd.com
all rights reserved copyright, trademark 2014
Friday, September 26, 2014
Emergency Space Solutions, After A Flood
The Glendale Union High School District experienced torrential rain storms, causing flood conditions. When they needed emergency space they came to Modular Solutions, Ltd in Phoenix. Our team has (6) classrooms in inventory that were ready to ship and set in place. By working closely with their site contractor McCarthy Construction and with the District Modular Solutions, Ltd was able to get emergency classrooms open for children in a matter of days.
The local and state building officials and Fire Marshall had to expedite the approval and placement policy to get the buildings approved for occupancy. This is a great example of what can be accomplished when you have a great team in place and everyone has a "can-do" attitude.
For more information on emergency modular building facilities contact our team:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1 (Sales)
Email: Information@Mod-sol.com
Website: www.ModularSolutionsLtd.com
all rights reserved copyright, trademark 2014 ©
The local and state building officials and Fire Marshall had to expedite the approval and placement policy to get the buildings approved for occupancy. This is a great example of what can be accomplished when you have a great team in place and everyone has a "can-do" attitude.
For more information on emergency modular building facilities contact our team:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1 (Sales)
Email: Information@Mod-sol.com
Website: www.ModularSolutionsLtd.com
all rights reserved copyright, trademark 2014 ©
Monday, September 22, 2014
Indoor Air Quality, What Is That?
One phrase that has been seen more in the modular building industry lately is "indoor Air Quality". What does that really mean?
Indoor air quality (IAQ) simply refers to the air quality within modular and traditional constructed buildings and structures. IAQ usually relates to the health and comfort of building occupants. IAQ can be affected by gases (including carbon monoxide, radon, volatile organic compounds), particulates, microbial contaminants (mold, bacteria), or any mass or energy stressor that can induce adverse health conditions. In most cases buildings being utilized for classroom or office use can be brought up to current standards by updating fresh air standards. Some occupants can be sensitive to the gases in a building (traditional or modular), and need special corrections.
When a project is LEED the category this usually falls under is Indoor Environmental Quality (IEQ). This is only one of the categories, that LEED uses as a standard to provide comfort, well-being, and productivity of the building occupants. The LEED IEQ category helps address design and construction guidelines pertaining to: indoor air quality (IAQ), thermal quality, and lighting quality.
Proper building ventilation, fresh air, windows, natural & electric lighting, VOC or gas emissions, all fall under the environmental conditions inside a modular or traditional structure.
For more information on proper indoor air quality levels and design contact our team:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1
email: information@mod-sol.com
website: www.modularsolutionsltd.com
all rights reserved, copyright trademark 2014©
Indoor air quality (IAQ) simply refers to the air quality within modular and traditional constructed buildings and structures. IAQ usually relates to the health and comfort of building occupants. IAQ can be affected by gases (including carbon monoxide, radon, volatile organic compounds), particulates, microbial contaminants (mold, bacteria), or any mass or energy stressor that can induce adverse health conditions. In most cases buildings being utilized for classroom or office use can be brought up to current standards by updating fresh air standards. Some occupants can be sensitive to the gases in a building (traditional or modular), and need special corrections.
When a project is LEED the category this usually falls under is Indoor Environmental Quality (IEQ). This is only one of the categories, that LEED uses as a standard to provide comfort, well-being, and productivity of the building occupants. The LEED IEQ category helps address design and construction guidelines pertaining to: indoor air quality (IAQ), thermal quality, and lighting quality.
Proper building ventilation, fresh air, windows, natural & electric lighting, VOC or gas emissions, all fall under the environmental conditions inside a modular or traditional structure.
For more information on proper indoor air quality levels and design contact our team:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1
email: information@mod-sol.com
website: www.modularsolutionsltd.com
all rights reserved, copyright trademark 2014©
Monday, September 15, 2014
We Need Worship Space...HELP!
Worship space is very common in the modular industry. Churches and religious organizations that are growing, but not enough to build their permanent structure are looking for ways to save money and time. By using a modular building as a semi-permanent space solution the church can continue to grow and be a part of a community without having to be a "church-in-a-box" where they lease space and pack and unpack their belongings every week.
What options are available for small religious communities?
1. Lease a previously leased modular building. They payments are affordable, and the building can be installed fairly quick. When you are done you just turn it back in.
2. Purchase a previously leased modular building. If you save up for a short period of time you will find the used modular buildings are less expensive than new
3. Lease/Purchase a previously leased modular building. This is a great way if you are planning on keeping the building for other uses when the permanent building goes in.
Semi-permanent modular buildings are a bridge between meeting on your home campus, and having your dream building.
The great thing about choosing Modular Solutions, Ltd for this type of building is we can also build the permanent building when you are ready (from inception - final warranty)
Get to know our great team at Modular Solutions, Ltd
Phone: 800-441-8577 x 1
email: information@mod-sol.com
website: www.modularsolutionsltd.com
all rights reserved copyright, trademark ©
What options are available for small religious communities?
1. Lease a previously leased modular building. They payments are affordable, and the building can be installed fairly quick. When you are done you just turn it back in.
2. Purchase a previously leased modular building. If you save up for a short period of time you will find the used modular buildings are less expensive than new
3. Lease/Purchase a previously leased modular building. This is a great way if you are planning on keeping the building for other uses when the permanent building goes in.
Semi-permanent modular buildings are a bridge between meeting on your home campus, and having your dream building.
The great thing about choosing Modular Solutions, Ltd for this type of building is we can also build the permanent building when you are ready (from inception - final warranty)
Get to know our great team at Modular Solutions, Ltd
Phone: 800-441-8577 x 1
email: information@mod-sol.com
website: www.modularsolutionsltd.com
all rights reserved copyright, trademark ©
Friday, September 12, 2014
Do Modular Buildings Have Safe VOC Levels?
A fairly new acronym in the construction and green industry is Volatile organic compounds (VOCs) They are organic chemicals that have a high vapor pressure at ordinary room temperature. Their high vapor pressure results from a low boiling point, which causes large numbers of molecules to evaporate or sublimate from the liquid or solid form of the compound and enter the surrounding air.
Where is VOC in a building?VOC's usually come from things like paint, carpet glue, wall glue, cleaning solvents and other components within a building. VOCs can sometimes cause symptoms to those that are sensitive, including headaches and dizziness. The federal government has strictly regulated the levels that are considered allowable by each industry. For example, The federal government caps the VOC content in paint at 250 grams per liter (g/l) for flat finishes and 380 g/l for other finishes (low-luster, semigloss, etc.). This is the standard that many companies utilize. HOWEVER there are companies that have invested into developing NO VOC paints. You can find those in chain stores and on line.
How do we get low or no VOC?VOC content is something that does not effect most of the population today because suppliers are making their formulas different to comply with federal guidelines, but you can specifically ask for a low or NO VOC content building and specify how and where you want that to occur. By doing your homework you can call out the brands and type of products you want in your modular building.
Look for the logos
What if we don't know what to choose?By hiring a professional modular building company such as Modular Solutions, Ltd you can work with the design & preconstruction team to ensure you are getting an environmentally friendly and safe building.
For more information with VOCs and other environmental issues on modular buildings contact our team at:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1
email: information@mod-sol.com
website: www.modularsolutionsltd.com
all rights reserved copyright, trademark ©
Where is VOC in a building?VOC's usually come from things like paint, carpet glue, wall glue, cleaning solvents and other components within a building. VOCs can sometimes cause symptoms to those that are sensitive, including headaches and dizziness. The federal government has strictly regulated the levels that are considered allowable by each industry. For example, The federal government caps the VOC content in paint at 250 grams per liter (g/l) for flat finishes and 380 g/l for other finishes (low-luster, semigloss, etc.). This is the standard that many companies utilize. HOWEVER there are companies that have invested into developing NO VOC paints. You can find those in chain stores and on line.
How do we get low or no VOC?VOC content is something that does not effect most of the population today because suppliers are making their formulas different to comply with federal guidelines, but you can specifically ask for a low or NO VOC content building and specify how and where you want that to occur. By doing your homework you can call out the brands and type of products you want in your modular building.
Look for the logos
What if we don't know what to choose?By hiring a professional modular building company such as Modular Solutions, Ltd you can work with the design & preconstruction team to ensure you are getting an environmentally friendly and safe building.
For more information with VOCs and other environmental issues on modular buildings contact our team at:
Modular Solutions, Ltd
Phone: 800-441-8577 x 1
email: information@mod-sol.com
website: www.modularsolutionsltd.com
all rights reserved copyright, trademark ©
Subscribe to:
Posts (Atom)

















.jpg)





























