How Long Does It Take To Install A Modular Building?

Modular Buildings have different uses. Depending on what the use and size of the building are depends on how long it takes to install a modular building.
Common uses:
Temporary construction trailer: One day or leess
Multi-section modular buildings for temporary use:one day per section
Permanent Modular Construction:
Usually set with a crane, and requires finishes on site (ie stucco, mechanical,floor coverings, etc) Allow 1 Week Per section for this type of use. This includes finishing all the architectural embellishments and move in ready. There are usually additional inspections required for this type of facility as well.

The fun part is watching a complete modular building be ready to occupy in a matter of days or weeks, from bare ground up.

For more installation tips & how-to's contact our preconstruction team at Modular Solutions, Ltd
Phone: 800-441-8577 x 1
Email: Information@ModularSolutionsLtd.com
Website: www.modularsolutionsltd.com

all rights reserved, copyright, trademark ©


No comments:

Post a Comment

Note: Only a member of this blog may post a comment.